![farm craft 2 textile factory farm craft 2 textile factory](http://www.farmingsimulator19mods.com/wp-content/uploads/2020/06/extended-factories-v3.0-fs19-1.jpg)
Put a basic container 2 studs to the left with the blue side face to the end of the Dual Assembler.Place a basic container in front of the two presses with the blue side face to the presses.(If you chose to add a T3 assembler) Place the assembler at the end and place a short conveyor and place a sell pad or place a regular conveyor if you have another layout on the other side.Place a sell pad in front of the dual assembler if you need to.Place the dual assembler in front of the basic containers.Place a basic container in front of the short conveyors.
![farm craft 2 textile factory farm craft 2 textile factory](http://images.fibre2fashion.com/Newsresource/images/191/indian-govt-to-help-develop-afghan-textile-industry_203331.jpg)
For whatever mine you put on the left, place the short conveyor 1 stud to the right instead of lined up (see setup image if you are confused).Place 2 presses in front of the 2 furnaces.Place 2 furnaces in front of both of them (make the output funnel on the left).Place an advanced resinite farm and an advanced titanium farm next to each other.Place a sell zone at the end of the T3 Dual Assembler.Then to the right of the resinite mines mirror the setup you just did with Titanium mines instead but place the crate facing left (see image).Place 2 resinite farms facing towards the conveyor.Place a T3 Dual Assembler at the end of the crate facing downwards.Put a T3 furnace and a T3 press following the conveyor.Place a sell zone at the end of the T2 Dual Assembler.Put a T2 Assembler below the sawmill as well as a crate going into the T2 Dual Assembler.Place 2 back to back T1 sawmills following the conveyor.Place a conveyor facing downwards and a stone farm on the other side of the conveyor.To the right of the right-most tree farm place a stone farm facing right.Place 2 tree farms facing towards the conveyor.Place a T2 Dual Assembler at the other side of the crate facing downward.Place a crate at the end of the assembler 2 studs to the right with the blue facing the end of the assembler (see image).Put a T1 cutter, a T1 press and then a T2 Assembler following the conveyor.2.8 Tier 5 Layout: Reinforced Trimetal PlateĮarly Layouts: Tier 1 Layout: Copper Wire.2.6 The items you will need: ~$139.31Sx.2.5 Tier 5 Layout: Reinforced Weirdsteel Plate.2.2 Tier 3 Layout: Advanced Living Alloy.